What checklist basic requirements are worth considering ?

Here’s a simple, general-purpose checklist template that you can adapt for any use case:

1. Define Objective

– Identify the goal or purpose of the task/project

– Clarify expectations and desired outcomes

2. Planning

– Break down the task into smaller steps

– Set deadlines or milestones

– Allocate necessary resources (time, budget, personnel)

3. Execution

– Start with the first task

– Track progress

– Adjust plan as needed based on new information

4. Review and Quality Control

– Check each completed step for accuracy

– Verify that the outcome meets the expected quality standards

– Address any issues or rework as needed

5. Finalization

– Complete the final step

– Gather all documentation

– Review entire project or task for completeness

6. Post-Completion

– Archive documentation or files

– Conduct a review or feedback session (if applicable)

– Implement lessons learned for future improvements

Many times we felt to create a checklist but overthinks the structure.. If still creating a checklist please use the above high-level points to serve as a guidance for you to create the checklist tailored to your business, industry and works.

For engineers, most probably it is a a sophisticated checklist that govern the engineering framework, policies and compliance in terms of health and safety to operate critical infrastructure equipment for the data center.

However, a bit business oriented process, a simpler business checklist expanding the above points would help efficiently drive the output desired for the end results.

Hope the above serve some nuggets and wisdom around the area of your need. Leave me a comment if you need further advice.